Case Study: High-Efficiency Cremator in Sweden


Matthews built and installed a high-efficiency cremator system in Jonkoping with a complete flue gas cleaning system. Featuring a 1.1m front door, rear-side ash discharge, an integrated ash cooling system, and an automatic coffin loader, this cremator is capable of 24-hour operation, and is used for 3-4 cremations daily. The heater circuit is connected to the district heating network, and the facility is in compliance with all relevant European environmental regulations.

INSTALLATION

Jonkoping, Sweden

NO. LINES

1 cremation system with flue gas cleaning system

CREMATIONS PER DAY

6-7 /each CRM

EMISSIONS

In compliance with the European Standards and Regulations within the country of installation.

YEAR OF INSTALLATION

2014

TYPE OF CREMATOR FURNACE

  • CRM 6R High-Performance Cremator 
  • Front Door Opening,  1100mm
  • Ash discharge in the rear side of the machine
  • Integrated ash cooling system
  • Automatic coffin insertion system with lifting truck
  • Heater circuit connected to district heating network
  • Flue gas cleaning with activated carbon fixed bed